Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "DCF"

  Search Again
Organization / Society
AIME (58)
AUSIMM (100)
DFI (1)
EPA (1)
NIOSH (48)
RMCMI (3)
SAIMM (44)
SME (119)
TMS (2)
USBM (2)



Showing: 1 to 10 of 378 matches for "DCF"  Page   1   2   3   4   5   6   7   8   9  next
TITLE An Investigation Of The Underpricing Inherent In DCF Valuation Techniques 
SUMMARY ... AND EXPLORATION, INC. PO BOX 625002· LITTLETON, COLORADO· 80162-5002 . AN INVESTIGATION
OF THE UNDERPRICING INHERENT IN DCF VALUATION TECHNIQUES 95-37 ...
AUTHOR Davis, G.
PUBLISHED 1995
TITLE Evaluation Of Open-Pit Mining Projects With Different Waste Schedules. 
SUMMARY ... The evaliation ofa project includes both a discounted cash flow (DCF)
analysis and a risk analysis. The DCF analysis determines ...
AUTHOR Trubetskoy, K. N. ; Peshkov, A.A. ; Matsko, N. A.
PUBLISHED 1996
TITLE International Investment Decision Making 
SUMMARY ... about the amount of available loan capital, and provided the project generates cash
over and above that required to service the debt then the DCF return on ...
AUTHOR Stewart, R. E.
PUBLISHED 1977
TITLE Unlocking Value In Projects Through Mining Economics Principles - 1. Introduction 
SUMMARY ... (DCF’s) Discounting Cash Flows. The use of DCF’s is a commonly accepted ... 8,000,000
Capital FCF After Tax FCF With Tax Shield Cumulative FCF Cum DCF Pay Back ...
PUBLISHED 2007
TITLE Determining Discounted Cash Flow Rate Of Return And Payout Time For Onshore Development Wells - A Graphical Method 
SUMMARY ... 8 ILLUSTRATIONS 1. Nomograph for determining DCF rate of return and payout time
for initial producing rates between 40 and 200 bopd per well..... 6 ...
AUTHOR Garland, T. M.
PUBLISHED 1973
TITLE The Evaluation of the Mining Aspects of Coal Projects 
SUMMARY ... The total evaluation can of course be expressed in a number of ways such as the
Discounted Cash Flow (DCF) Rate of Return, the Net Present Value or, the ...
PUBLISHED 1975
TITLE Copper Production Costs Vs. Required Prices 
SUMMARY ... It is worth examining: why NPV/DCF methods have limited use in copper project
evaluations the value of industry production cost analysis ...
AUTHOR Kovisars, Leons
PUBLISHED 1979
TITLE One Project, Two Discount Rates 
SUMMARY ... Evidently, discounted cash flow (DCF) analysis of mineral property value, even when
properly performed, does not reflect the full value of the property. ...
AUTHOR Davis, G. A.
PUBLISHED 1997
TITLE Cost Ranking Studies in the Mining Industry 
SUMMARY ... ABSTRACT Whilst decisions to commit projects have traditionally been heavily influenced
by hurdle rates for dcf analysis, it is suggested that evaluation of ...
PUBLISHED 1985
TITLE Surface mine reserve definition and the high-grading fallacy (Technical Note) 
SUMMARY ... eral sequence required to extract the maximum eco- turn (DCF-ROR) is defined. ...
identified at the point where the NPV or DCF-ROR is at ...
AUTHOR Lemieux, M.
PUBLISHED 2000
Showing: 1 to 10 of 378 matches for "DCF"  Page   1   2   3   4   5   6   7   8   9  next

Search Again