Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "H. Link"

  Search Again
Organization / Society
AIME (755)
AUSIMM (654)
DFI (68)
EPA (4)
IMMS (4)
NIOSH (692)
RMCMI (147)
SAIMM (254)
SME (901)
TMS (57)
USBM (3)



Showing: 1 to 10 of 4440 matches for "H. Link"  Page   1   2   3   4   5   6   7   8   9  next
TITLE Challenge of Design for the Westerscheldetunnel in the Netherlands 
SUMMARY ... GEOLOGY At the point of the planned road link, the Westerschelde is approx 6 km
wide ... The separator has been designed to manage approximately 2000 m³/h for each ...
AUTHOR U JΣger
PUBLISHED 1999
TITLE Winter Marine Construction In Northern Alberta - Construction Of Baffle Walls Sundance Cooling Pond Expansion Sundance Generating Plant Wabamun, Alberta, Canada ? Introduction 
SUMMARY ... Two Link Belt LS-108B, 45 Ton Crawler Cranes ... The dock was constructed on driven steel
H-piles, steel support beams and timber mats on top of crossbeams. ...
AUTHOR Morrison, Robert R.
PUBLISHED 1997
TITLE Non-Parametric Bayesian Learning for Resource Estimation in the Autonomous Mine 
SUMMARY ... is fully defined by its mean function m x ^ h and covariance function ,xx k l ^
h : 1. Research Fellow, Australian Centre for Field Robotics, Link Building J13 ...
AUTHOR F Ramos
PUBLISHED 2011
TITLE Milling Methods And Costs At The Pecos Concentrator Of The American Metal Co., Tererro, N. Mex. - Introduction 
SUMMARY ... METAL CO., TERERRO, N. MEX. BY H. D. BEMIS MAY, 1932 ... I By H. D. Bemis 2 INTRODUCTION
This paper des cribing t he milling praotice of the Ame rican Metal Co. ...
AUTHOR Bemis, H. D.
PUBLISHED 1932
TITLE Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, Pa 
SUMMARY ... were drilled with Barcus 40 ton Link Belt 108 pile rig which was ideal for long
reaches into the top of terraced retaining wall caps and for 1 H:4V Batter Pile ...
PUBLISHED 2001
TITLE Pre-Strip-Mining by Bucket Wheel Excavators 
SUMMARY ... Each consists of one BWE, 600 3 typ SchRs 21, with 1100 m /h (bank) capa- city,
1400 m face conveyor, 325 m link con- veyor, 1350 m dump conveyor, one tripper ...
PUBLISHED 1981
TITLE Milling Operations At New Broken Hill Consolidated Limited 
SUMMARY ... 22. Conveyor 900 nun wide. 23. Link belt SS 48 vibrating feeder. 24. ... The normal
operating tonnage is 270 tonnes/h. Liners used in the grinding mills are ...
AUTHOR Braes J R ; Neale J R
PUBLISHED 1983
TITLE Effect Of Cycle Time On Work Done By The Pistons During Hydraulically Actuated Clamshell Dredging 
SUMMARY ... H i ... Length of Third Connecting Rod R 3 [in] 24.78 Length of Imaginary Link [in] 48.46
Length of piston force to moment point ] [in 24.784 Length of cutting ...
AUTHOR Osei, B. A.
PUBLISHED 2011
TITLE Slurry Loading Of Ironsand Concentrate At Taharoa 
SUMMARY ... Mean loading time * (h) 58.3 53.2 ... was repaired but bad weather prevented the
reinstatement of the northwesterly leg and a gale in July caused a link failure ...
AUTHOR Gadd D E
PUBLISHED 1980
TITLE Slurry Loading of Ironsand Concentrate Attaharoa 
SUMMARY ... Mean loading time * (h) 58.3 53.2 ... was repaired but bad weather prevented the
reinstatement of the northwesterly leg and a gale in July caused a link failure ...
AUTHOR D E Gadd
PUBLISHED 1980
Showing: 1 to 10 of 4440 matches for "H. Link"  Page   1   2   3   4   5   6   7   8   9  next

Search Again