Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "MAINTENANCE AS COST OR INVESTMENT"

  Search Again
Organization / Society
AIME (2600)
AUSIMM (3780)
DFI (84)
DOI (5)
EPA (7)
IMMS (9)
NIOSH (3510)
RMCMI (187)
SAIMM (765)
SME (4630)
TMS (250)
USBM (12)



Showing: 1 to 10 of 16100 matches for "MAINTENANCE AS COST OR INVESTMENT"  Page   1   2   3   4   5   6   7   8   9  next
TITLE Preventive Maintenance Plus Vibration Analysis = Maximum Availability Plus Minimum Cost 
SUMMARY ... Individual components vary, and reclaimers in particular are noted in the industry
as relatively high maintenance cost units with anticipated availability of ...
AUTHOR McGuirk, Charles H.
PUBLISHED 1983
TITLE Plant Improvements and Cost Reduction at the Great Boulder Proprietary Gold Mines Limited 
SUMMARY ... ment, it is necessary to make allowance for the average cost of maintenance
on the new equipment over an extended period. Could Messrs. ...
AUTHOR Harris J W
PUBLISHED 1956
TITLE Plant Improvement and Cost Reduction at the Great Boulder Proprietary Gold Mines Limited 
SUMMARY ... In 1952 the total maintenance cost for the section was £4,142 and' in 1953 this
had increased to £4,505, the' latter cost being made up of £1,623 for labour ...
AUTHOR Harris J W
PUBLISHED 1955
TITLE Maintainability Design [Guidline For] Of Underground Mining Equipment: Volume I - Final Technical Report 
SUMMARY ... essibl-· .-, itv--l', Availability Sys tem Effec tiveness Rpliability Human
Factors Maintenance Cost Anthropometry Over l::xertion ...
AUTHOR Conway, E. J. (Kirk)
PUBLISHED 1988
TITLE The Seismic Monitoring Decision at Mt Charlotte Gold Mine 
SUMMARY ... Operation, maintenance and cost The time taken to operate the network, obtain accurate
locations and source parameters, and do housekeeping, averages eight ...
AUTHOR Poplawski R F
PUBLISHED 1995
TITLE Semi-Autogenous Grinding At The Paddington Goldmine 
SUMMARY ... Operational costs Cost ($/tonne ore) Labour 0.17 Power 0.90 ·Linens 0.40
Balls 0.44 1.91 ./ Maintenance costs Cost ($/tonne ore) ...
PUBLISHED 1987
TITLE Economics Of Recycling Metals And Minerals From Urban Refuse 
SUMMARY ... Estima ted a nnual opera ting cost, 250-tpd i nc i
nerator re s idue pl ant--8-hour day ..•.. ...
AUTHOR Sullivan, P. M.
PUBLISHED 1971
TITLE Maximum Panel Width Determination for Sub-level Caving with Bottom Ore Drawing 
SUMMARY ... sub-level sill pillars. To decrease maintenance cost of these drives, their
cross-sectional areas are taken within 7 to 7.5 m 2 . ...
AUTHOR Adranyl W W
PUBLISHED 1995
TITLE Maximizing Return On Capital Projects 
SUMMARY ... and the potential net present value achieved by the capital investment is far from ...
per ton – first 5 years <94% of industry norm Maintenance cost per asset ...
AUTHOR Humphries, J.
PUBLISHED 2011
TITLE Improved Solution Mining Production Cost Model ? Introduction 
SUMMARY ... OPERATING COST ANALySIS ..... It It ..... to ... 23 23 23 24 25 27
4.5 Maintenance and t lies, Insurance •.•.. 27 ...
PUBLISHED 1982
Showing: 1 to 10 of 16100 matches for "MAINTENANCE AS COST OR INVESTMENT"  Page   1   2   3   4   5   6   7   8   9  next

Search Again