Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "Off Grade 3"

  Search Again
Organization / Society
AIME (2660)
AUSIMM (4840)
DFI (184)
DOI (2)
EPA (12)
IMMS (16)
NIOSH (4400)
RMCMI (137)
SAIMM (841)
SME (4000)
TMS (491)
USBM (1)



Showing: 1 to 10 of 20500 matches for "Off Grade 3"  Page   1   2   3   4   5   6   7   8   9  next
TITLE Gold Mine Evaluation Some Evaluation Concepts 
SUMMARY ... 2. The nature and grade of the mineralisation being sampled. 3. The background grade.
4. The economic cut off grade. L Cue 2 I - I, ca.. 2 I - I, L ...
PUBLISHED 1987
TITLE Mine Profit Enhancement Through Cut-Off Grade Management 
SUMMARY ... This tax will have the effect of reducing the present value of the surpluses which
will then tend to depress the cut-off grade below those applied in Table 3. ...
AUTHOR Hunter M M
PUBLISHED 1992
TITLE Tonnes, Grade and Economics û The ZC Mine Experience 1985-1988 
SUMMARY ... of head grade accompanying these changes from a grade of about 20 ... 3. During the same
interval the ore reserves and resources ... at a 10% Pb + Zn cut-off was 53.8 ...
PUBLISHED 1990
TITLE In-Situ Leaching of Oxide Gold Deposits 
SUMMARY ... In Tables 2 and 3, the effect of systematic variations in solution contact
period and well diameters on cut-off grade, per-tax rate of ...
PUBLISHED 1991
TITLE The Effect of Open Pit Scale Economies on the Mt Leyshon Gold Mine 
SUMMARY ... TABLE 3 Ore resource models established September 1991 Mt Leyshon Gold Mine. cut
offgrades as indicated. Model ame Selective Resource Grade Base of Cut Off (g/t ...
AUTHOR Slight M ; Hodkinson I
PUBLISHED 1992
TITLE Lead-zinc Ore Mining at the Isa Mine of Mount Isa Mines Limited, Mount Isa, Queensland 
SUMMARY ... enough together to bulk up to above the cut-off grade. ... of pyrite, and tend to be
relatively low grade. The footwall 'Racecourse' orebodies are 3 m to 25 m thick ...
PUBLISHED 1993
TITLE Pit-Blend Optimisation - A Case Study in Iron Ore 
SUMMARY ... 3. The third technique produced the best result. ... Mol, 0 and Gillies, S, 1984,
Cut-off grade determination for mines producing direct-shipping iron ore, Proc ...
AUTHOR Piotto P
PUBLISHED 1996
TITLE A Novel Approach to Estimate the Gap Between theáMiddle- and Short-Term Plans 
SUMMARY ... t P 3 production capacity of phase 3 in t c 1 haulage cost c 2 load plus haulage
cost rhdl maximum rehandle δ tolerance G St.CO low grade stock c ut-off G tar ...
AUTHOR J Ortiz
PUBLISHED 2011
TITLE Ore Dilution Sources in Underground Mines - Interpretation and Evalution Methods 
SUMMARY ... (3) (3a) Geological reserves (T g ) The tonnage of ore contained within the natural
geological limits or drawn to a specified cut-off grade. ...
AUTHOR Szymanski J
PUBLISHED 1995
TITLE Chlorine Based In-Situ Leaching of Alluvial Gold Deposits 
SUMMARY ... The potential exists for a significant improvement in fine gold recovery, a
cut-off grade of less than 0.2 glm 3 and reduced mine life through the potential ...
PUBLISHED 1992
Showing: 1 to 10 of 20500 matches for "Off Grade 3"  Page   1   2   3   4   5   6   7   8   9  next

Search Again