Cost Calculations for Underhand Cut-and-Fill Mining |
| SUMMARY |
... Stope crew size 3 Productivity, st/ miner shift 9.5 ... Page 4. UNDERCUT-AND-FILL MINING Table 2. Underhand Cut-and-Fill Stoplng Sand Filllng Cost, 10-Ft' Vein ... |
| AUTHOR |
Pugh, Gordon M. ; Rasmussen, David G. |
| PUBLISHED |
1982 |
|
 |
|
|
|
|
|
|
|
| TITLE |
Contracts at ZC/NBHC Mines |
| SUMMARY |
... The Type 2 contract applied to tinIDer and undercut-and-fill stoping has ... of the stoping miners has increased in line with their inproved productivity of 26 ... |
| PUBLISHED |
1985 |
|
 |
|
| TITLE |
Undercut-and-Fill Stoping for Rock Burst Control |
| SUMMARY |
... The Phase I study indicated undercut-and-fill stoping could be a ... During Phase 11, the method was tested in an operating mine, and productivity, relative cost ... |
| AUTHOR |
Jenkins, F. Michael ; Dorman, K. Robert |
| PUBLISHED |
1984 |
|
 |
|
| TITLE |
Mechanization of Rock Drilling at Inco |
| SUMMARY |
... The productivity in these stopes rose to 23 tons per man shift from an average of 15 for non- mechanized undercut-and-fill stopes. ... |
| AUTHOR |
Green, G. R. ; McDonald, R. C. |
| PUBLISHED |
1972 |
|
 |
|
|
|
|
|
|