TITLE Are Long TBM Tunnels Faster by TBM? 
SUMMARY ... ventilation delay, mucking, bolting, shotcreting) and advance per round are each
strongly linked to the Q-value (Barton et al., 1974, Grimstad and Barton, 1993 ...
AUTHOR Barton, Nick
PUBLISHED 2001
TITLE Ground Support Methodology Employing Shotcrete For Underground Mines 
SUMMARY ... crusher chambers and maintenance shops) support correspond to an “Excavation Support
Ratio” (ESR) of 3 and 0.6 - 1.3, respectively (Grimstad and Barton,1993 ...
AUTHOR Pakalnis, R.
PUBLISHED 2010
TITLE Initial Stability Study Of Large Openings For The National Underground Science Laboratory At The Homestake Mine, Lead, Sd 
SUMMARY ... 3) and Grimstad and Barton [4] (fig.4), the recommended support for all three sites
agreed well with the support used at these sites (table 1), indicating that ...
AUTHOR Tesarik, Doug
PUBLISHED 2002
TITLE Application of modified Hoek-Brown transition relationships for assessing strength and post yield behaviour at both ends of the rock competence scale - Synopsis 
SUMMARY ... shear strength rather than by material strength, the empirical Q-system and
Mathews-Potvin type support design charts (Grimstad and Barton, 1993, Potvin et ...
AUTHOR Carter, T. G.
PUBLISHED 2008
TITLE Use of Tunnel Boring Machines at Depth: Extending the Limits 
SUMMARY ... relatively high intact strengths (>150 MPa typically), and with only limited joint-
ing (s > 0.1, Q > 10 approximately [Barton, 1976; Grimstad and Barton, 1995 ...
AUTHOR Downing, Bruce ; Carter, Trevor ; Beddoes, Richard ; Moss, Allan ; Dowden, Peter
PUBLISHED 2007
TITLE Rock Mass Characterization For Excavations In Mining And Civil Engineering 
SUMMARY ... the advancing mining front might follow the changes sug- gested by Grimstad and
Barton [1993] for the case of mining drifts in massive rock surrounding an ore ...
AUTHOR Barton, Nick, PH.D.
PUBLISHED 2007
TITLE Comparison of different systems for rock mass characterisation and lessons from the Äspö Test Case, Sweden 
SUMMARY ... system is the Tunnelling Quality Index (Q) based on a large amount of case histories
of underground excavation in hard rock (Grimstad & Barton, 1993). ...
AUTHOR Lanaro, F. ; Röshoff, K. ; Jing, L. ; Christiansson, R.
PUBLISHED 2003
TITLE New York Subway Stations And Crossover Caverns—Update On Initial Support Design 
SUMMARY ... The four differing design approaches that were used to verify and optimize the IGSR
chart are as follows: Empirical methods (Q, [Barton & Grimstad 2004], RMR ...
AUTHOR Desai, Dru ; Lagger, Hannes, ; Stone, Charles
PUBLISHED 2007
TITLE Application Of The Q-System To Australian Underground Metal Mines 
SUMMARY ... concluded that significantly more support was being used than is recommended by
the Q-system tunnel reinforcement design chart (after Grimstad and Barton [1993 ...
AUTHOR Peck, Warren A. ; Lee, Max F.
PUBLISHED 2007
TITLE Potential Development of the Underground Science City in Rock Caverns at Kent Ridge in Singapore 
SUMMARY ... support requirements have been assessed using the method developed by the Norwegian
Geotechnical Institute (Barton, Lien, Lunde, 1974; Grimstad and Barton, 1993 ...
AUTHOR Nelson, C. ; Petersen, L. ; Carmody, J. ; Pound, C. ; Zhao, J. ; Cai, J. G. ; Lee, K. W.
PUBLISHED 2001