Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "gate road roof support"

  Search Again
Organization / Society
AIME (99)
AUSIMM (87)
DFI (3)
EPA (1)
NIOSH (228)
RMCMI (35)
SAIMM (13)
SME (311)
TMS (1)



Showing: 1 to 10 of 778 matches for "gate road roof support"  Page   1   2   3   4   5   6   7   8   9  next
TITLE Design Methodology For Standing Secondary Roof Support In Longwall Tailgates 
SUMMARY ... wood and concrete cribbing for secondary roof support. ... applicable for these alternative
support technologies ... error approach to tongwail gate road support is no ...
AUTHOR Mucha, Thomas P. ; Barczak, Thomas M. ; Dolinar, Dennis R. ; Bower, Joe ; Bryja, James J.
TITLE The Critical Pillar Concept In Yield Pillar-Based Longwall Gate Road Design 
SUMMARY ... yield nonviolently or yield before the roof and floor ... damage, but is too small to
support full abutment ... a field study of a tapering gate road was conducted by ...
AUTHOR Koehler, J.R.
PUBLISHED 1995
TITLE Gob Canopy Roof Support for Difficult Natural Conditions 
SUMMARY ... Kelley, JH "Gob Canopy for a Mine Roof Support" USPatent #4.480.946 ... Wuest, WJ "Critical
pillar concept in yield-pillar-based longwall gate-road design." Minina ...
AUTHOR Kelley, Jay Hilary
PUBLISHED 1997
TITLE Applications Of The Coal Mine Roof Rating (CMRR) For Ground Control Planning And Operations 
SUMMARY ... to learn and use, CMRR data are a useful tool with applications to longwall gate
road pillar design, safety hazard mapping, and artificial roof support analysis ...
AUTHOR Wuest, W.J.
PUBLISHED 1995
TITLE Breaking The Glass Ceiling In Advance Rates Via Technology And People 
SUMMARY ... Gate road development is via single entry, full extraction, with passive roof support
using arches and props. The longwalls operate in an advancing sequence. ...
AUTHOR Lewis, B. C.
PUBLISHED 1999
TITLE Investigation of Longwall Gateroad Roof Support Characteristics at Powhatan No. 4 Mine - Instrumentation Plan 
SUMMARY ... 4 Page 4. INVESTIGATION OF LONGWALL GATE ROAD ROOF SUPPORT CHARACTERISTICS AT POWHATAN
NO. 4 MINE Instrumentation Plan by G. J. Chekan 1 and D. R. Babich 1 ...
AUTHOR Chekan, G. J.
PUBLISHED 1982
TITLE Longwall Retreat of Gate Road Pillars – RI 9444 
SUMMARY ... the loads imposed on the gate road pillars and ... Pillar and support loading measurements
and stability observations revealed that the roof and the ...
AUTHOR Listak, J. M. ; Bauer, E. R.
PUBLISHED 1993
TITLE Breaking The Glass Ceiling In Advance Rates Via Technology And People 
SUMMARY ... Gate road development is via single entry, full extraction, with passive roof support
using arches and props. The longwalls operate in an advancing sequence. ...
AUTHOR Lewis, B. C.
PUBLISHED 1999
TITLE Development Rates Using Conventional Continuous Miner Technology in Deep Underground Mines in Australia 
SUMMARY ... 0 Gate Road Pillar 2H Gate Road Pillar 2H <<;, 100 x 50m 50x5Om ... ij Cutting & loading
time -::: Wheeling time , Roof support time Rib support time Fig. ...
AUTHOR Misra A
PUBLISHED 1991
TITLE Tailgate Support Evaluation at Plateau Mining Company 
SUMMARY ... Gate road layout directly impacts loads transferred to the tailgate (1). Roof
defonnations and support loads are also affected by the roof and floor lithology. ...
AUTHOR Maleki, H. N.
PUBLISHED 1986
Showing: 1 to 10 of 778 matches for "gate road roof support"  Page   1   2   3   4   5   6   7   8   9  next

Search Again