Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "hang-up"

  Search Again
Organization / Society
AIME (134)
AUSIMM (84)
DFI (2)
IMMS (1)
NIOSH (75)
RMCMI (6)
SAIMM (31)
SME (101)
TMS (1)



Showing: 1 to 10 of 435 matches for "hang-up"  Page   1   2   3   4   5   6   7   8   9  next
TITLE Safe Effective Hang-Up Clearance - Objective 
SUMMARY ... 98, May 1981 Safe Effective Hang-Up Clearance ... Oevelop a device that can be operated
from a safe distance to f'xplosively propel a projectile into the hang-up. ...
PUBLISHED 1981
TITLE Safety Considerations for Transport of Ore and Waste in Underground Ore Passes 
SUMMARY ... ferent rock types and geologic struc- tures, ore pass designs and hang-up removal
melhods that work in one mine may not work in another, or they may even not ...
AUTHOR Stewart, B. ; Inverson, S. ; Beus, M.
TITLE Safety considerations for transport of ore and waste in underground ore passes 
SUMMARY ... B. S'IEWART, S. IVERS[IN AN[I M. BEUS ferent rock types and geologic struc- tures,
ore pass designs and hang-up B. Stewart S. lverson and M. Beus, members SME ...
AUTHOR Stewart, S. ; Beus, M. ; Iverson, S.
PUBLISHED 2000
TITLE Experience With Bin Operations Use Of Stainless Steel Conical Hoppers ? Introduction 
SUMMARY ... 070 to 7.070 moisture. Even at this size and moisture content, the arching,
rat-holing and hang-up was ... This resulted in "stickyf1 coal hang-up on the sides ...
AUTHOR Larimer, Thomas M.
PUBLISHED 1968
TITLE The Influence Of Rockpass Excavation And Operation On The Structural Design Of Box Fronts 
SUMMARY ... First, the location of the hangup relative to the drawpoint must be determined. ... to
which explosives are attached, up the ore pass to the hang-up and detonating ...
AUTHOR Achilleoudes, S.
PUBLISHED 2005
TITLE The Modeling Of Gravity Flow Of Ore In Ore Passes 
SUMMARY ... The MSHA database (1987-1996) on accidents and fatalities related to failure or
hang-up of ore passes, reports a total 743 nonfatal accidents (eg, permanent ...
AUTHOR Nazeri, H. ; Rozgonyi, T. G.
PUBLISHED 2003
TITLE Part Seven - Mine Pager Phone To Public Telephone Interconnect System – Introduction 
SUMMARY ... " answering" the phone, and activates the automatic hang-up timer . ... Also the
emergency manual hang-up switch can be used toclear the sys tem. ...
PUBLISHED 1974
TITLE Case Study Of The Rockpass System At Kloof No. 3 Shaft 
SUMMARY ... Developing an access leg to the blockage, rigging up a diamond drill machine, and
drilling the big rock causing the hang-up, eventually brought it down. ...
AUTHOR Hart, R.
PUBLISHED 2006
TITLE An Application of Linear Programming for Block Cave Draw Control 
SUMMARY ... In the slusher drift type cave, ‘hang-up control’ was a major problem.
Not only was it a frequent problem, which is beneficial ...
AUTHOR G J van Hout ; A von Johannides ; L F
PUBLISHED 2000
TITLE How to avoid building a full- scale pilot plant by predicting and eliminating solids handling problems 
SUMMARY ... or pellets soften and, with solids contact pressures associated with the full-scale
plant, may fuse to- gether, thus providing a possible solids hangup in the ...
AUTHOR Johanson, Jerry R.
PUBLISHED 1990
Showing: 1 to 10 of 435 matches for "hang-up"  Page   1   2   3   4   5   6   7   8   9  next

Search Again