Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "mains pillars"

  Search Again
Organization / Society
AIME (60)
AUSIMM (58)
NIOSH (143)
RMCMI (3)
SAIMM (5)
SME (245)



Showing: 1 to 10 of 514 matches for "mains pillars"  Page   1   2   3   4   5   6   7   8   9  next
TITLE Investigation of the causes of roof falls in a deep underground coal mine 
SUMMARY ... stress field is considered to be responsible for the roof falls, pos- sible mining
alternatives include: Adopting larger pillars in the 1 Right mains. ...
AUTHOR Su, W. H. ; Peng, S. S.
PUBLISHED 1987
TITLE Stress Issues Impacting Design And Stability At OCI Wyoming’s Big Island Trona Mine 
SUMMARY ... confirmed (1) that the 38- KPa/m (1.69-psi/ft) depth gradient, measured in 2000,
was due to time-dependent load transfer from the large mains pillars, and (2 ...
AUTHOR Agapito, J. F. T. ; Gilbride, L. J. ; Hollberg, K.
PUBLISHED 2004
TITLE Long-Term Stability for Two-Seam Mining at OCI's Big Island Mine 
SUMMARY ... width Panel pillars Room widths Crosscut spans Barrier pillar widths Mains
pillars Mains entry widths Figure 7 shows the interburden ...
AUTHOR Agapito, J. F. T.
PUBLISHED 1999
TITLE Toward Pillar Design to Prevent Collapse of Room-and-Pillar Mines 
SUMMARY ... Pillars in the mains were 12 by 18 m, and panel pillars were 9 by 18 m. The panel
pillars were mined with a 6-m-wide split, leaving 6- by 9-m stumps having a ...
AUTHOR Zipf, R. Karl, Jr.
TITLE Field Evaluation Of Mobile Roof Support Technologies 
SUMMARY ... lies directly under the 1st Main North, but shifts some 24 m (80 ft) toward the
east and so the last (most westerly) row of 1st North Mains pillars is not ...
AUTHOR Maleki, Hamid ; Owens, John ; Endicott, Marc
TITLE An Engineering Analysis Of "Squeeze" Failure Of Pillars In The Pittsburgh Coal Bed 
SUMMARY ... units finishing up in the C. Mains area of the mine. The section was driven in accord-
ance with an approved plan for splitting the old pillars lengthwise and ...
AUTHOR Mishra, George
PUBLISHED 1981
TITLE Evaluation Of Mobile Roof Support Technologies 
SUMMARY ... panel lies directly under the 1st Main North, but shifts some 24 m (80 A) toward
the east and so the last (most westerly) row of 1st North Mains pillars is not ...
AUTHOR Maleki, Hamid
PUBLISHED 2001
TITLE Cable Bolting - Potential Applications For Variable Strata Conditions 
SUMMARY ... wide by 105 ft. long (actual ). Entry widths are 20 ft. Stable pillars
in the mains are 150 ft. wide by 230 ft. long (actual). In ...
AUTHOR Allen, David
PUBLISHED 1994
TITLE The Effect Of Atmospheric Pressures On The Oxygen Level In A Sealed Mine 
SUMMARY ... 3) and advanced upgrade at 1 pct. Butt headings were driven to the left
and later to the right of the mains. Pillars of coal 76 ft ...
AUTHOR Moebs, N. N.
PUBLISHED 1972
TITLE Current Practice Of Pillar Design In US Coal Mines 
SUMMARY ... In the mains, square pillars with di- mensions ranging from 12 to 14 m ... A wide scatter
of the safety lictors for the pillars in mains and rooms warrants a ...
AUTHOR Tsang, P. ; Peng, S. S. ; Biswas, K.
PUBLISHED 1997
Showing: 1 to 10 of 514 matches for "mains pillars"  Page   1   2   3   4   5   6   7   8   9  next

Search Again