Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "raise,"

  Search Again
Organization / Society
AIME (2700)
AUSIMM (2370)
DFI (77)
DOI (1)
EPA (7)
IMMS (6)
NIOSH (3130)
RMCMI (97)
SAIMM (435)
SME (2690)
TMS (130)
USBM (18)



Showing: 1 to 10 of 9340 matches for "raise,"  Page   1   2   3   4   5   6   7   8   9  next
TITLE New York Paper February, 1918 - Branch Raise System at the Ruth Mine, Nevada Consolidated Copper Co. 
SUMMARY Page 1. BRANCH RAISE BYSTEM AT THE RUFH MINE 299 Branch Raise System at the Ruth
Mine, Nevada Consolidated Copper Co.* ... 300 BRANCH RAISE SYSTEM AT THE RUTH MINE ...
AUTHOR Larsh, Walter S.
PUBLISHED 1918
TITLE Raise and Shaft Drilling, A Continuing Development 
SUMMARY Page 1. Raise and shaft drilling, a continuing development RICHARD J. ROBBINS*
(Visitor) ... II:::t 2000 1600 1200 800 400 FT. Raise Drill Capacity 2 3 4 ...
AUTHOR Robbins, Richard J.
TITLE The Economics of Mechanical Raise Boring 
SUMMARY ... The Economics Mechanic Raise Boring NE Norman and James H. Dye of raising,
each advantage must be considered. ... Advantages of Raise Boring ...
AUTHOR Norman, N. E. ; Dye, James H.
PUBLISHED 1981
TITLE A Novel Method Of Raise Development At Molycorp 
SUMMARY ... NUMBER 91-34 A NOVEL METHOD OF RAISE DEVELOPMENT AT MOLYCORP J. P. Hedlund ... RAISE
DEVELOPMENT Raise development in the past has been accomplished using a ...
AUTHOR Hedlund, J. P.
PUBLISHED 1991
TITLE Rock Mass Classification is Only Part of the Answer to Assess Raise Boring 
SUMMARY ... Raise Boring ... For this paper the proposed raise bore is a 350 m deep, 4 m diameter
ventilation shaft at Oceana Gold’s Frasers mine, Macraes Flat, New Zealand. ...
AUTHOR J Wallis
PUBLISHED 2008
TITLE The optimization of raise-connection spacing in gold mines 
SUMMARY ... The optimization of raise-connection spacing ... Introduction The distance between raise
connections is a major design parameter in scattered gold-mining layouts. ...
AUTHOR Lawrence, D. R.
PUBLISHED 1983
TITLE Down-the-Hole Blasthole Drill Jumbos for Underground Stoping 
SUMMARY ... The layout for conventional drilling consists of one access raise, one ore chute,
five sublevels with two sub- headings and one crosscut per sublevel. ...
AUTHOR Anderson, Bernard F.
PUBLISHED 1982
TITLE Raise Excavation Method Selection ? Introduction 
SUMMARY ... Preprint 11-085 RAISE EXCAVATION METHOD SELECTION ... Support may or may not be
needed depends on the purpose of the raise and rock quality. ...
AUTHOR Chen, S.
PUBLISHED 2011
TITLE Alimak Vein Mining 
SUMMARY ... INTRODUCTION The Alimak raise climber was first introduced in 1957 by Linden Alimak
of Sweden and was soon realised to be a more efficient and safer method of ...
PUBLISHED 1993
TITLE The Development Of L44 Ventilation Shaft (Surface To 11 Level), Mount Isa Mine Limited 
SUMMARY ... sections. Development was based on stripping the shaft to a bored pilot
raise. ... operations. 1. Boring of the pilot raise. 2. Presink. ...
AUTHOR Martin R E
PUBLISHED 1977
Showing: 1 to 10 of 9340 matches for "raise,"  Page   1   2   3   4   5   6   7   8   9  next

Search Again