|
Showing: 1 to 10 of 230 matches for "tbm cost estimate"
|
Page
1
2
3
4
5
6
7
8
9 next
|
|
| TITLE |
Performance of a TBM and a Roadheader in the Coal Measure |
| SUMMARY |
... face was 0.16 m" pick and 591.4 m3 /disc respec- tively for the Titan roadheader and the Robbins TBM. Using a cost estimate of £7.50 for a pick and £1000.00 ... |
| AUTHOR |
Athorn Mary-Lee ; Snowdon, Randall A. |
| PUBLISHED |
1986 |
|
 |
|
|
|
| TITLE |
Selection of TBM Backup Systems |
| SUMMARY |
... concrete, that will form part of the final lining is installed as the TBM progresses. ... decided to achieve the desired cost estimate. It is ... |
| AUTHOR |
Peach, Anthony J. |
| PUBLISHED |
1995 |
|
 |
|
| TITLE |
Exploration Decision Analyses for the Brightwater Tunnels |
| SUMMARY |
... and the potential for boulders, frequent maintenance of the TBM cutterhead will ... the unknown cost risk and associated cost contingencies in the bid estimate. ... |
| AUTHOR |
Gilbert, M. B. ; Perrone, V. J. ; Maday, L. |
| PUBLISHED |
2005 |
|
 |
|
| TITLE |
Northside Storage Tunnel Project |
| SUMMARY |
... An initial work schedule and cost estimate was also produced ... could severely impact the time and cost objectives of ... Harbour using a Wirth 6.57 m diameter TBM. ... |
| AUTHOR |
R J Cuttler |
| PUBLISHED |
1999 |
|
 |
|
|
|
|
|
| TITLE |
Transbay Transit Center - Keeping DTX on Track |
| SUMMARY |
... evaluation of the use of stacked drift, tunnel boring machine (TBM) and the ... Developed LPA Cost Estimate In late 2005, the DTX Team initiated the develop- ment ... |
| AUTHOR |
Penrice, Derek J. |
| PUBLISHED |
2008 |
|
 |
|
|
|
|
|
|
Showing: 1 to 10 of 230 matches for "tbm cost estimate"
|
Page
1
2
3
4
5
6
7
8
9 next
|
|