Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "tbm thrust"

  Search Again
Organization / Society
AIME (1)
AUSIMM (50)
DFI (3)
NIOSH (13)
RMCMI (1)
SAIMM (10)
SME (343)
TMS (1)



Showing: 1 to 10 of 422 matches for "tbm thrust"  Page   1   2   3   4   5   6   7   8   9  next
TITLE The Relationship Between Tunnel Convergence and Machine Operational Parameters and Chip Size for Double Shield TBMs— A Case History of Ghomroud Water Conveyance Tunnel 
SUMMARY ... that the amount of the tunnel convergence has direct correlation with the percentage
of fines and large rock fragments in the muck and TBM thrust/torque/ROP. ...
AUTHOR Farrokh, Ebrahim ; Rostami, Jamal
PUBLISHED 2007
TITLE Development And Performance Of Large Diameter Cutters For Use On High Performance TBM's 
SUMMARY ... to accommodate the additional load. Increases in TBM thrust and power have
resulted in better performance in hard rock by allowing ...
AUTHOR Deering, Kenneth ; Dollinger, Gerald L., PH.D. ; Krauter, David ; Roby, Joseph A.
PUBLISHED 1991
TITLE Tunnel Boring Machine Instrumentation 
SUMMARY ... 943 Figure 4 - The pressure transducer used for measuring TBM thrust pressure. Figure
5 - The displacement transducer mounted on rear set of grippers. Page 9. ...
AUTHOR Wang, Fun-Den ; Ozdemir, Levent ; Snyder, Larry ; Fishman, Charles
PUBLISHED 1979
TITLE Incline/Decline Boring With Tunnel Boring Machines 
SUMMARY ... The TBM thrust/gripper system requires modification in boring in- clines. Ignoring
friction, machine thrust is reduced by machine weight x sin (incline angle). ...
AUTHOR Brockway, Jack E., P. E.
PUBLISHED 1983
TITLE The Mechanical Boring Of Rock – Yesterday And Tomorrow 
SUMMARY ... rock. TBM thrust was reacted through a tunnel wall gripper system and the
machine had no need to push off of the lining. The low ...
AUTHOR Handewith, H. J.
PUBLISHED 2001
TITLE TBM Use in Mine Development 
SUMMARY ... Ground support was in the form of steels sets and mesh, installed within the shield
of the TBM. Thrust was delivered through 24 x 1.7 m stroke rams, providing ...
AUTHOR Zamel G I ; Zenari L P
PUBLISHED 1993
TITLE More Than 1,300 Underground Professionals Attend RETC 
SUMMARY ... studies show that the amount of the tunnel convergence has a correlation with the
percentage of fines and large rock fragments in the muck and TBM thrust/torque ...
PUBLISHED 2007
TITLE Seismic Response of Precast Tunnel Linings 
SUMMARY ... loading imposed during construction—initial in-situ stresses, response due to
excavation by earth pressure balance TBM, annulus grouting and TBM thrust loads ...
AUTHOR Kramer, Gary J.E. ; H. Sedarat, H. ; Kozak, A. ; Liu, A. ; Chai, J.
PUBLISHED 2007
TITLE Utilization of Strain Measurements on Shielded Tunnel Boring Machines 
SUMMARY ... Despite modifications to increase the TBM thrust capacity from the manufactured
limit of 27,270 kN (6.6 million lbf) to 54,540 kN (13 million lbf), and the ...
AUTHOR Murray, Brad
PUBLISHED 2008
TITLE Evaluation of Geological Conditions Ahead of TBM Using Seismic Reflector Tracing and TBM Driving Data 
SUMMARY ... 449 Ground Evaluation Using TBM Data The TBM thrust, torque, penetration rate, and
gripper pressure are automatically measured and used to calculate the rock ...
AUTHOR Yamamoto, Takuji ; Shirasagi, Suguru ; Murakami, Koji ; Descour Jozef
PUBLISHED 2007
Showing: 1 to 10 of 422 matches for "tbm thrust"  Page   1   2   3   4   5   6   7   8   9  next

Search Again