TITLE Reef development with a tunnel boring machine on a South African platinum mine 
SUMMARY ... The boring phase of the trial took place over six months and the average rate of
penetration of the TBM was 0,47 metres/hour. TBM utilisation was 22%. ...
AUTHOR Stander, M. ; Rhodes, K. ; Horrell, P. ; Sammons, D. ; Harrison, G. ; Dean, J.
PUBLISHED 2001
TITLE Second Manapouri Tailrace Tunnel Not Just “A Walk in the Park” 
SUMMARY ... Following implementation of a joint incentive programme (discussed later
in paper) in August 1999 TBM utilisation began to improve. ...
AUTHOR Martin, Tom ; Heer, Brian ; Macfarlane, Don
PUBLISHED 2003
TITLE Blue Mountains Sewage Transfer Scheme - A Review of Tunnelling 
SUMMARY ... This type of TBM allowed the tunnel route to zig zag from one side of the ridge
to the other giving the Board the scope to pick up most of the developed land ...
AUTHOR McQueen LB
PUBLISHED 1993
TITLE Bergen And Beyond: Western Norway's Plans For A Tunnel And Bridge Network 
SUMMARY ... 20% BERGEN AND BEYOND UTILISATION TBM Tube 2 1227 WEEK ... UTILISATION TBM Tube 1 u Boring
u Reegrippirxf u Cutter changing u ReP.TBM u Rep. back-up u Others 130/d ...
AUTHOR Martinsen, Josef
PUBLISHED 1987
TITLE Modern Tunneling Technology In Deep German Coal Mines Under Difficult Ground Conditions 
SUMMARY ... performances being close to 40 m/d. TBM utilisation rate (machine operating time
in relation to total time) is 30 to 40 %. One third of all downtimes ...
AUTHOR Hudewentz, Dietrich F.C. ; Lücker, Alfred H. F.
PUBLISHED 1983
TITLE Utilisation of Underground Space in Final Open Pit Walls at Surface Mines 
SUMMARY ... Due to geological and geotechnical conditions and the utilisation of mined-out ...
tunnelling, which uses roadheaders or tunnel boring machines (TBM), has become ...
AUTHOR T Sasaoka ; H Shimada
PUBLISHED 2008
TITLE Manila Aqueduct (Philippines) — The Construction of the Umiray-Angat Tunnel Project — A Success of Organisation and Technology Against a Unique Combination of the Most Adverse Conditions Ever Encountered in Tunneling 
SUMMARY ... THE TBM AND AUXILLARY EQUIPMENT The Contract specified the utilisation of
a shielded TBM able to erect a precast segmental lining. ...
AUTHOR Grandori, Remo
PUBLISHED 2001
TITLE Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build Contract 
SUMMARY ... has proved particularly effective across the varying ground conditions and was very
reliable with an amazing 0% down time against the TBM utilisation time. ...
AUTHOR Salisbury, David ; Hake, David
PUBLISHED 2005
TITLE Database of TBM Projects Undertaken Between 1950 and 1990 and an Assessment of Associated Ground Strength Limitations 
SUMMARY ... indicate the required number of TBM working hours that are required to achieve a
desired tunnel drivage length at a particular equipment utilisation level. ...
PUBLISHED 1993
TITLE Field Application of NTH Fracture Classification at the Second Manapouri Tailrace Tunnel, New Zealand 
SUMMARY ... tunnel) 1.13 49 Average 1.21 34 Note: ROPs and utilisation are based on
TBM hour clock readings. Page 6. 241 In general, because ...
AUTHOR Macfarlane, Don F.
PUBLISHED 2008