Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "underground mine survey"

  Search Again
Organization / Society
AIME (3200)
AUSIMM (1260)
DFI (11)
DOI (3)
EPA (10)
NIOSH (2060)
RMCMI (98)
SAIMM (377)
SME (2890)
TMS (22)
USBM (27)



Showing: 1 to 10 of 9470 matches for "underground mine survey"  Page   1   2   3   4   5   6   7   8   9  next
TITLE The Radio Imaging Method (RIM) -- A Means Of Detecting And Imaging Anomalous Geologic Structures In A Coal Seam 
SUMMARY ... RIM is an electromagnrtio (EM) wave process which consists of in-mine and surface
survey techniques. Both tech- niques are used in underground coal manes to ...
AUTHOR Fry, Rodger
PUBLISHED 1984
TITLE Silica Dust Sources In Underground Metal/Nonmetal Mines - Two Case Studies 
SUMMARY ... In the case of the limestone mine, a dust survey was conducted at an underground
dump/crusher facility to quantify dust levels before the potential ...
AUTHOR Chekan, G. J. ; Colinet, J. F. ; Grau, H. R., III
TITLE Mine Communications - An Overview Of The Bureau Of Mines Communications Research 
SUMMARY ... within operating mines; (2) survey of existing ... the preparation of guidelines for
mine communications; and (5) new products for underground communications. ...
AUTHOR Parkinson, Howard E.
TITLE Research Needs – Acknowledgments – References - Glossary 
SUMMARY ... Injection Well Strata for Acid Mine Disposal in ... M., "Disposal of Liquid Wastes by
Injection Underground-- ... Nor Millennium," U. S. Geological Survey Circular 631 ...
PUBLISHED 1970
TITLE Methane Drainage Study Using an Underground Pipeline, Marianna Mine 58 – RI 8577 
SUMMARY ... Hole depth versus survey time (hole 2).... Initial gas ... METHANE DRAINAGE
STUDY USING AN UNDERGROUND PIPELINE, MARIANNA MINE 58 ...
AUTHOR Prosser, L. J., Jr. ; Finfinger, G. L. ; Cervik, J.
PUBLISHED 1981
TITLE Evaluation Of Mine Seals Using Ground Penetrating Radar 
SUMMARY ... by Geophysical Survey Systems, Inc. ... system and is available as an intrinsically safe
unit for use in the underground coal mine environment (figure 1). ...
AUTHOR Monaghan, William D. ; Trevits, Michael A. ; Sapko, Michael J.
TITLE Evaluation of Work Positions used by Continuous Miner Operators in Underground Coal Mines 
SUMMARY ... of survey and observation information provides a good representation of operators
and mining configurations from a cross-section of underground mine operations ...
AUTHOR Bartels, J. R.
PUBLISHED 2009
TITLE Stone Mine Design in Highly Fractured Rock 
SUMMARY ... A discontinuity survey is an established procedure2 that locates ... mine site depending
on the mine's size and ... The underground mine is planned to extend from an ...
AUTHOR Scovazzo, Vincent
PUBLISHED 2002
TITLE Delineation Of Abandoned Workings With An In-Seam Seismic Method 
SUMMARY ... The survey was performed to economically detwnine the maximum extend ... the south, relatiie
to the proposed new underground developments of the Kathleen Mine. ...
AUTHOR Geldmacher, I.
PUBLISHED 1990
TITLE Continuous Mining - A pilot study of the role of visual attention locations and work position in underground coal mines 
SUMMARY ... and pillars is brmed, resulting in mkiw of horizontal mine pasageways (Figure 11 ...
and obr haza r? rrus situations assu- ciated with mining underground coal MSHA ...
AUTHOR Bartels, John R.
PUBLISHED 2009
Showing: 1 to 10 of 9470 matches for "underground mine survey"  Page   1   2   3   4   5   6   7   8   9  next

Search Again