Register  
Forgot Password?
Forgot User Name?
 

Search Results

Search Results for "underground scheduling"

  Search Again
Organization / Society
AIME (172)
AUSIMM (507)
DFI (16)
EPA (1)
NIOSH (126)
RMCMI (28)
SAIMM (131)
SME (614)
USBM (2)



Showing: 1 to 10 of 2290 matches for "underground scheduling"  Page   1   2   3   4   5   6   7   8   9  next
TITLE A PC-Based Worker Scheduling System For Underground Mines 
SUMMARY ... PREPRINT NUMBER 96-64 A PC-BASED WORKER SCHEDULING SYSTEM FOR UNDERGROUND MINES
R. L. Grayson S. Q. Yuan West Virginia University Morgantown, West Virginia ...
AUTHOR Grayson, R. L.
PUBLISHED 1996
TITLE A Large-Scale Work Scheduling Algorithm For Underground Coal Mines 
SUMMARY ... programming model, solution of the model, and implementation of the work scheduling
algorithm to the assignment problems of an underground coal mine. ...
AUTHOR Yuan, S.
PUBLISHED 1994
TITLE Underground and Open-Cut Coal Scheduling Using Expert Systems 
SUMMARY ... The number of strategies which must be considered in open cut scheduling is,
however, usually much larger than in underground scheduling. ...
AUTHOR Whitchurch, K. ; Cram, A. A. ; Ozawa, N. ; Koizumf, K.
PUBLISHED 1996
TITLE Long-Term Production Scheduling In Underground Coal Mines - An Application Of Sequencing Theory 
SUMMARY ... The problem of scheduling underground coal production has thus been reduced to the
general problem of nonpreemptive scheduling of precedence constrained jobs ...
AUTHOR West-Hansen, J.
PUBLISHED 1986
TITLE Use Of Underground Haulage Simulators A Case Study Of The Loveridge Mine 
SUMMARY Page 1. Chapter 19 USE OF UNDERGROUND HAULAGE SIMULATORS A CASE STUDY OF THE LOVERIDGE
MINE Colin M. Kelly Mining Engineer Consolidation Coal Company ...
AUTHOR Kelly, Colin M.
PUBLISHED 1986
TITLE Linear Integer Programming Model Applied To Scheduling Of Iron Ore Production At The Kiruna Mine, Kiruna, Sweden 
SUMMARY ... The study carried out in this research has demonstrated that complex underground
scheduling problems as they exist at the Kiruna Mine can be formulated as a ...
AUTHOR Dagdelen, K. ; Kuchta, M. ; Topal, E.
PUBLISHED 2003
TITLE A Practical Procedure For Underground Development And Production Scheduling, Using A Microcomputer 
SUMMARY ... Thus, it is apparent that the long range planning and scheduling of underground
development and prod- uction and an evaluation of the rela- tionship between ...
AUTHOR Farahmand, D., PH. D.
PUBLISHED 1986
TITLE 3.6 Underground Long-Range Planning and Design - 1. Technical Overview - Introduction 
SUMMARY ... The development of computer methods for underground long-range planning has tended
to focus on the areas of production simulation, scheduling of units, outby ...
AUTHOR Suboleski, S. C.
PUBLISHED 1979
TITLE Introduction To Mine Planning And Scheduling Applications 
SUMMARY ... Scheduling open pits and underground operations present two entirely different
challenges. In both mine environments, the scheduling ...
AUTHOR Gibbs, Betty L.
PUBLISHED 1989
TITLE Computer Simulation Analysis Of Underground Coal-Mine Main Production Systems In The Peoples Republic Of China 
SUMMARY Page 1. Chapter 18 COMPUTER SIMULATION ANALYSIS OF UNDERGROUND COAL-MINE MAIN
PRODUCTION SYSTEMS IN THE PEOPLES REPUBLIC OF CHINA Y. an and F. L. Wilke ...
AUTHOR Nan, Y.
PUBLISHED 1986
Showing: 1 to 10 of 2290 matches for "underground scheduling"  Page   1   2   3   4   5   6   7   8   9  next

Search Again