A Discussion on Design Methods to Improve Long-Term Performance of Tunnel Projects

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 6
- File Size:
- 161 KB
- Publication Date:
- Jan 1, 2008
Abstract
In the wake of the collapse of the ceiling panels in the I-90 section of the Central Artery/Tunnel (CA/T) Project in 2006, the long term performance of tunnels became the focus of the tunneling industry. At the time of the accident, the tunnel had been open to traffic for about 10 years. This paper will discuss design methods and considerations to improve the long term performance and durability of a tunnel. The major problems found during the inspection of several tunnels will also be presented and the causes for these problems will be discussed.