A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

The Australasian Institute of Mining and Metallurgy
Y Ren
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
755 KB
Publication Date:
Sep 26, 2013

Abstract

The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents a new scheduling algorithm that incorporates with a novel stockpile configuration system, an improved algorithm on multiple processes and a mixed-integer linear programming (MILP) global optimisation model. It can simultaneously optimise stockpiles, blending, multiple processes as well as multiple mines. In addition, it allows the user to interact with the solution to adjust the solution to be practical and desirable.CITATION:Ren, Y, 2013. A simultaneous optimisation tool for open pit mine scheduling, in Proceedings World Gold 2013 , pp 427-432 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation

APA: Y Ren  (2013)  A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

MLA: Y Ren A Simultaneous Optimisation Tool for Open Pit Mine Scheduling. The Australasian Institute of Mining and Metallurgy, 2013.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account