Actual vs. Baseline Tracking During TBM Tunneling In Highly Variable Glacial Geology

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 1000 KB
- Publication Date:
Abstract
The Bright water Conveyance System includes 21 km of tunnels mined by two earth pressure balance Tunnel Boring Machines (TBMs) and two slurry TBMs. The probabilistic baseline approach defined in the Geotechnical Baseline Report (GBR) can representatively be verified by use of a comprehensive tracking system to identify face conditions that allows comparison with the baselines. The glacial geology includes a high lateral variation in soil types that, when combined with the pressurized face tunneling methods, creates challenges for documenting face conditions. Baseline tracking using spoil samples and TBM operational parameters provides information to document actual conditions and support resolution of differing site condition claims.
Citation
APA:
Actual vs. Baseline Tracking During TBM Tunneling In Highly Variable Glacial GeologyMLA: Actual vs. Baseline Tracking During TBM Tunneling In Highly Variable Glacial Geology. Society for Mining, Metallurgy & Exploration,