Advanced Process Control at Jerritt Canyon

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 416 KB
- Publication Date:
- Jan 1, 2000
Abstract
Advanced process control has been implemented at the Jerritt Canyon Mill. Plant production prior to 1997 was limited by grind circuit capacity. The installation of additional mill horsepower and an optimizing supervisory control system achieved a throughput increase in excess of 12 percent. The controller application utilized a seamlessly integrated fuzzy logic expert system for real-time mill control coupled with a neural network predictor for closed-loop feedback of particle size constraints. In late 1998, a second supervisory controller was installed to operate the fluidized bed roasters. The second controller optimized roasting conditions, increased plant throughput and improved metallurgical recovery.
Citation
APA:
(2000) Advanced Process Control at Jerritt CanyonMLA: Advanced Process Control at Jerritt Canyon. Society for Mining, Metallurgy & Exploration, 2000.