Advanced Shaft Lining System

Society for Mining, Metallurgy & Exploration
R. N. Torbin
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
8
File Size:
874 KB
Publication Date:
Jan 1, 1988

Abstract

Foster-Miller has recently developed a new concept.for a highly specialized shaft lining system. This innovative shaft lining system uses a continuous slipforming placement technique. lining the shaft from the bottom up such as in a raised bored shaft. Although this part is not unique, the concept is designed to use polyurethane foam instead of concrete for the liner material. Furthermore, the concept is designed to attain rates of advance of 30 m/hr. The polyurethane foam liner is designed to be thinner (100 mm) than a conventional concrete liner (300 mm). It will eliminate the high cost associated with the erection and operation of an on-site concrete batch plant. The system will be designed to be operated remotely, requiring few personnel for its operation. This system (or parts of it) may be appropriate where fast construction speed is required or where a jointless liner is needed.
Citation

APA: R. N. Torbin  (1988)  Advanced Shaft Lining System

MLA: R. N. Torbin Advanced Shaft Lining System. Society for Mining, Metallurgy & Exploration, 1988.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account