Alternative Contracting Methods?An Update

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 133 KB
- Publication Date:
- Jan 1, 2008
Abstract
The author?s paper at RETC 2007, ?Alternative Contracting Methods? addressed strengths and weaknesses of DBB+DB and introduced Construction Manager/General Contractor (Portland model) and Alliancing (Australian model). Considerable interest in these was expressed by several public agencies at that Conference and at the presentation. The author is assisting the Washington State Department of Transportation (WSDOT) and the Toronto Waterfront Revitalization Corporation (TWRC) with possible implementation of Alliancing. WSDOT is evaluating ways to do this and is considering a delivery methodology, under existing Legislation, based on the CMGC Portland model with incentives and disincentives, moving towards Alliancing. This paper will build on the 2007 paper and update implementation considerations.
Citation
APA:
(2008) Alternative Contracting Methods?An UpdateMLA: Alternative Contracting Methods?An Update. Society for Mining, Metallurgy & Exploration, 2008.