Alternative Contracting Methods?An Update

Society for Mining, Metallurgy & Exploration
John Reilly
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
9
File Size:
133 KB
Publication Date:
Jan 1, 2008

Abstract

The author?s paper at RETC 2007, ?Alternative Contracting Methods? addressed strengths and weaknesses of DBB+DB and introduced Construction Manager/General Contractor (Portland model) and Alliancing (Australian model). Considerable interest in these was expressed by several public agencies at that Conference and at the presentation. The author is assisting the Washington State Department of Transportation (WSDOT) and the Toronto Waterfront Revitalization Corporation (TWRC) with possible implementation of Alliancing. WSDOT is evaluating ways to do this and is considering a delivery methodology, under existing Legislation, based on the CMGC Portland model with incentives and disincentives, moving towards Alliancing. This paper will build on the 2007 paper and update implementation considerations.
Citation

APA: John Reilly  (2008)  Alternative Contracting Methods?An Update

MLA: John Reilly Alternative Contracting Methods?An Update. Society for Mining, Metallurgy & Exploration, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account