American College Tunnels in Athens, Greece—Design and Construction of Very Large Diameter Tunnels in Rock

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 5788 KB
- Publication Date:
- Jan 1, 2001
Abstract
Part of the Imittos Western Peripheral Motorway in Athens is the twin road tunnel in the vicinity of American College, with 20m excavation diameter. In the paper, the environmental and other requirements, the geometry and the geological – geotechnical characteristics of the rock formations in the construction area are given. Information regarding the modeling and analysis methods that are used for the design of the temporary support, the final lining and the wedge and slope stability analysis is described thoroughly. Finally, the results of the analyses are compared with these of measurements and general remarks during the construction of the tunnels.
Citation
APA:
(2001) American College Tunnels in Athens, Greece—Design and Construction of Very Large Diameter Tunnels in RockMLA: American College Tunnels in Athens, Greece—Design and Construction of Very Large Diameter Tunnels in Rock. Society for Mining, Metallurgy & Exploration, 2001.