Analysis of TBM Performance and Disc Cutter Consumption in Yinhanjiwei Water Conveyance Tunnel Project

Society for Mining, Metallurgy & Exploration
Ya-dong Xue Zhen-xing Diao Feng Zhao
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
13
File Size:
878 KB
Publication Date:
Jan 1, 2016

Abstract

"Two important aspects of excavation performance of TBM are advance rate and cutter replacement/ring consumption, which is closed to the cost and construction duration of the project. To achieve this, a database of TBM parameters and the geological-geotechnical conditions during the excavation of Yinhanjiwei was compiled and analyzed. Relationships between different geological and TBM operational parameters were investigated. Results of analyzes show that there are qualitative correlation between Field Penetration Index (FPI) and rock geological parameters. And strong relationships between FPI and operational parameters are suggested. In this study, the cutter replacement and ring consumption were analyzed using statistical method for preliminary estimation in similar conditions. 1. ITRODUCTION Hard rock TBM is widely used in tunneling project nowadays because of its advantages to conventional drilling and blasting, especially in long tunnels. The biggest advantage is its high advance rate. However, rock conditions of tunnels are complicated. So TBM performance becomes a primary topic in tunneling engineering, which includes of rate of penetration, utilization, daily advancement, cutter consumption and so on. Many prediction models have been developed to estimate the TBM performance in the project planning phase. The most widely accepted and used models around the world are semi theoretical CSM model (Rostami and Ozdemir, 1993; Rostami, 1997) and the empirical NTNU model (Blindheim, 1979, Bruland, 1998).With increasing uses of TBMs in different ground conditions, an increasing number of researchers have developed new models in order to predict the performance of TBM more accurately in similar geological conditions.(Gong and Zhao, 2009; Hassanpour et al.,2009, 2010, 2011, 2014; Delisio et al., 2013; Delisio and Zhao, 2014)"
Citation

APA: Ya-dong Xue Zhen-xing Diao Feng Zhao  (2016)  Analysis of TBM Performance and Disc Cutter Consumption in Yinhanjiwei Water Conveyance Tunnel Project

MLA: Ya-dong Xue Zhen-xing Diao Feng Zhao Analysis of TBM Performance and Disc Cutter Consumption in Yinhanjiwei Water Conveyance Tunnel Project. Society for Mining, Metallurgy & Exploration, 2016.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account