Aspects of In-Seam Development for Subsequent Full Extraction

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
402 KB
Publication Date:
Jan 1, 1976

Abstract

Severe development difficulties were experienced soon after in-seam mining commenced at Appin Colliery in'1962. Thirteen years later no significant pro- gress had been made in overcoming some aspects of this development problem. Some success had been achieved in destressing roadways both in development and pillar extraction. Longwall retreat mining had shown promise of being highly productive but at an extremely high cost in terms of development requirements both in number of roadways and intensity of support in those roadways. No real advance was made in the problem of driving the first heading of a group of headings under conditions of apparently high stress in directions other than the preferred mining directions, although failure of the roof in this heading did seem to give easier work in the subsequent headings driven particularly if they were driven on narrow centres.
Citation

APA:  (1976)  Aspects of In-Seam Development for Subsequent Full Extraction

MLA: Aspects of In-Seam Development for Subsequent Full Extraction. The Australasian Institute of Mining and Metallurgy, 1976.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account