BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

The Australasian Institute of Mining and Metallurgy
D Ford
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
14
File Size:
4379 KB
Publication Date:
Jan 1, 2007

Abstract

BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow for incremental capacity increases in future. The arrangement of the dumper is similar to other car dumper installations existing on site. To construct the facility, approximately 120 000 m3 of material was excavated in six months, to a total depth of 22 m. The saline water table was nominally 6 m below ground level and the materials excavated varied depending on depth, ranging from sand to mangrove muds. There was a need to retain the sides of the excavation and limit the amount of water from entering the excavated area. This was required to allow excavation to progress and had to be maintained during construction of the permanent concrete and steel facility. The excavation was backfilled progressively as construction progressed. Various retaining wall methods were investigated with the preferred option being sheet piles secured by walers and ground anchors. Detailed electronic models were developed and assessed to complete the final design arrangement. Dewatering bores around the perimeter of the excavation removed the groundwater to intercepted sumps within the site. A strict and methodical program was developed to monitor the integrity of the temporary works and the quality of the groundwater. The works were completed on time despite the following challenges being encountered: availability of resources and equipment, movement of mobile plant on æboggyÆ materials, difficulty driving sheet piles into material at depth, drilling of ground anchors to 32 m, grouting of ground anchors, greater than expected groundwater flows, and the risk of hydrocarbons within the groundwater. The lessons learned from the use of the retention system and, in particular, the associated construction challenges overcome, provide a sound basis for similar work in this buoyant resource market. The conference paper describes the temporary works options investigated, design considerations and processes, construction methodology and challenges encountered, and the monitoring systems developed. Lessons learned are also discussed.
Citation

APA: D Ford  (2007)  BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

MLA: D Ford BHP Billiton Iron Ore Car Dumper 4 - Temporary Works. The Australasian Institute of Mining and Metallurgy, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account