Blast Optimisation for Downstream Processes - Heavy ANFO in Small Diameter Holes

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
4
File Size:
717 KB
Publication Date:
Jan 1, 1999

Abstract

Whilst employed by Dyno Nobel as the Technical Services Engineer û Brisbane, I was asked, as part of a contractual agreement, to look at optimising PioneerÆs blasting process to provide the most effective rock to the new crushing and screening plant. This paper details the preliminary blast designs and practices that have been in use at the quarry and the initial changes made to these designs, and the effect they have had on the excavation and crusher performance.
Citation

APA:  (1999)  Blast Optimisation for Downstream Processes - Heavy ANFO in Small Diameter Holes

MLA: Blast Optimisation for Downstream Processes - Heavy ANFO in Small Diameter Holes. The Australasian Institute of Mining and Metallurgy, 1999.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account