Blasting for Reduced Process Plant Costs at Argyle Diamond Mine

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 10
- File Size:
- 1251 KB
- Publication Date:
- Jan 1, 1998
Abstract
Mining of the AKI lamproite pipe at the Argyle Diamond Mine (ADM) commenced in 1985. Originally designed to mine ore at a rate of 3.6 Mt per annum, the project has gone through two major plant expansions to a designed production rate of 8.7 Mt
Citation
APA:
(1998) Blasting for Reduced Process Plant Costs at Argyle Diamond MineMLA: Blasting for Reduced Process Plant Costs at Argyle Diamond Mine. The Australasian Institute of Mining and Metallurgy, 1998.