Blasting for Reduced Process Plant Costs at Argyle Diamond Mine

The Australasian Institute of Mining and Metallurgy
Smallnone P Walker B
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
10
File Size:
1251 KB
Publication Date:
Jan 1, 1998

Abstract

Mining of the AKI lamproite pipe at the Argyle Diamond Mine (ADM) commenced in 1985. Originally designed to mine ore at a rate of 3.6 Mt per annum, the project has gone through two major plant expansions to a designed production rate of 8.7 Mt
Citation

APA: Smallnone P Walker B  (1998)  Blasting for Reduced Process Plant Costs at Argyle Diamond Mine

MLA: Smallnone P Walker B Blasting for Reduced Process Plant Costs at Argyle Diamond Mine. The Australasian Institute of Mining and Metallurgy, 1998.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account