BOCCOST Modelling Tracking and Relating Mine and Mill Performance Indicators in Real Time to Increase SAG Mill Throughput

The Australasian Institute of Mining and Metallurgy
L E. Setiawan
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
465 KB
Publication Date:
Jan 1, 2002

Abstract

The mining and milling groups at Batu Hijau are tasked with increasing SAG mill throughput by approximately ten per cent. Avenues used for this process are blasting and crushing optimisation, ore blending and predicting SAG mill throughput in relation to the geological model. This is in line with traditional æMine to MillÆ studies. At Batu Hijau, mill and mine sequencing cannot readily be configured to perform the surveys traditionally required by a æMine to MillÆ study while meeting the daily production target of 140 000 tonnes per day and processing from varying ore types in one pit. A program called BOCCOST (blasting optimisation crushing conveying optimising SAG throughput) has been implemented to capture approximately 200 variables from blasting, mining and milling operations and assign them to a common point in space in the geological model in real time. Interpretive analysis of data from BOCCOST is used to model relationships between the 200 variables to determine which and how these factors affect SAG throughput. Once these relationships are determined, the blasting, ore blending and crushing process can be optimised to generate a product that maximises mill throughput. The relationships modelled from BOCCOST are also used to generate a SAG mill throughput estimator, which can be coded into the production block model. The block model can be reconciled with the geological block model for correlation by geological domain. Once this relationship is established, SAG mill throughput domains can then be established for predicting SAG mill throughput. This SAG mill throughput estimator is then used in conjunction with revenue calculations to determine an ore cut-off, which combines these two elements to maximise metal production.
Citation

APA: L E. Setiawan  (2002)  BOCCOST Modelling Tracking and Relating Mine and Mill Performance Indicators in Real Time to Increase SAG Mill Throughput

MLA: L E. Setiawan BOCCOST Modelling Tracking and Relating Mine and Mill Performance Indicators in Real Time to Increase SAG Mill Throughput. The Australasian Institute of Mining and Metallurgy, 2002.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account