Brightwater Conveyance System: Ground Freezing For Access Shaft Excavation Through Soft Ground

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 517 KB
- Publication Date:
Abstract
The Brightwater regional wastewater treatment facility, under construction in King County, WA, includes an extensive conveyance system that will feature deep, soft-ground tunnels and shafts. Excavation of the Ballinger Way Receiving Portal to 65.8 m (216 ft) below grade through challenging geology was accomplished by means of artificial ground freezing. This paper discusses freeze design development, system installation and monitoring, and the contractual and construction challenges that were overcome, including work sequencing and excavation means and methods, together with lessons learned.
Citation
APA:
Brightwater Conveyance System: Ground Freezing For Access Shaft Excavation Through Soft GroundMLA: Brightwater Conveyance System: Ground Freezing For Access Shaft Excavation Through Soft Ground. Society for Mining, Metallurgy & Exploration,