Bulk Unloading With High Speed Vertical Screws

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 6
- File Size:
- 349 KB
- Publication Date:
- Jan 1, 1983
Abstract
[On Pier D in the Port of Long Beach, California, the Port of Long Beach has built a new bulk cement distribution terminal. The facility is operated by Pacific Coast Cement Corporation, who designed the complex and leased it from the Port of Long Beach on a 40-year lease. At one bulk cement is unloaded from vessels carrying from 12,000 to 30,000 t. The unloading is performed with pig speed mechanical unloading equipment and delivered into a concrete silo complex with, a capacity of 50,000 t. From the silos, bulls cement is loaded into trucks for delivery. The facility was completed in September 1981.]
Citation
APA:
(1983) Bulk Unloading With High Speed Vertical ScrewsMLA: Bulk Unloading With High Speed Vertical Screws. Society for Mining, Metallurgy & Exploration, 1983.