The Henderson Mine developed a water treatment system in 1985 to meet the NPDES requirements for its mine water discharge. Unacceptable levels of Zinc and Manganese formed the basis for the design and operation of the treatment system. Since initial start up, this system has reliably removed metals from the mine water and facilitated low cost compliance with water standards. The potential addition of a bio- monitoring requirement to the NPDES Permit in 1990 has added a second dimension to the metals removal process. This paper will review the history of Henderson's success at developing a low capital treatment system for metals removal and the anticipated effects of bio-monitoring upon this system based upon preliminary bio-monitoring screening.
Citation
APA:
(1991) Case History of Mine Water Treatment at the Henderson Mine and The Adaptation to Bio-Monitoring RegulationsMLA: Case History of Mine Water Treatment at the Henderson Mine and The Adaptation to Bio-Monitoring Regulations. Society for Mining, Metallurgy & Exploration, 1991.