Cemented Hydraulic Fill Mix Design As it Applies To Mine Scheduling

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
7
File Size:
318 KB
Publication Date:
Jan 1, 1973

Abstract

The need to schedule ore production to make maximum use of the strength gained by cem- ented fill during curing is discussed, to show how cement content and hence fill cost can be kept down for any particular operation. Results from laboratory testwork on Isa Mine fill conducted by the author while employed by Mount Isa Mines Limited form the basis of the Discussion
Citation

APA:  (1973)  Cemented Hydraulic Fill Mix Design As it Applies To Mine Scheduling

MLA: Cemented Hydraulic Fill Mix Design As it Applies To Mine Scheduling. The Australasian Institute of Mining and Metallurgy, 1973.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account