Challenges And Solutions To Designing Deep Excavations For Urban Transit Stations

Society for Mining, Metallurgy & Exploration
Andrew H. Liu Ching-Liu Wu John Hawley James Chai
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
298 KB
Publication Date:
Jan 1, 2007

Abstract

The Hatch Mott MacDonald/Bechtel Joint Venture team is designer and construction manager for the 5.25-mile Tunnel Segment of the overall 16-mile Silicon ValleyRapid Transit Project, which extends the existing Bay Area Rapid Transit (BART) system southward from Fremont to San Jose. The Tunnel Segment includes twin boredtunnels, mined cross passages, and three deep station excavations situated in highlyvariable ground, high ground water table, and a dense urban setting with high-risebuildings adjacent to the largest excavation. This paper will discuss design challengesthat have arisen with the excavations and the proposed solutions.
Citation

APA: Andrew H. Liu Ching-Liu Wu John Hawley James Chai  (2007)  Challenges And Solutions To Designing Deep Excavations For Urban Transit Stations

MLA: Andrew H. Liu Ching-Liu Wu John Hawley James Chai Challenges And Solutions To Designing Deep Excavations For Urban Transit Stations. Society for Mining, Metallurgy & Exploration, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account