Challenges And Solutions To Designing Deep Excavations For Urban Transit Stations

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 298 KB
- Publication Date:
- Jan 1, 2007
Abstract
The Hatch Mott MacDonald/Bechtel Joint Venture team is designer and construction manager for the 5.25-mile Tunnel Segment of the overall 16-mile Silicon ValleyRapid Transit Project, which extends the existing Bay Area Rapid Transit (BART) system southward from Fremont to San Jose. The Tunnel Segment includes twin boredtunnels, mined cross passages, and three deep station excavations situated in highlyvariable ground, high ground water table, and a dense urban setting with high-risebuildings adjacent to the largest excavation. This paper will discuss design challengesthat have arisen with the excavations and the proposed solutions.
Citation
APA:
(2007) Challenges And Solutions To Designing Deep Excavations For Urban Transit StationsMLA: Challenges And Solutions To Designing Deep Excavations For Urban Transit Stations. Society for Mining, Metallurgy & Exploration, 2007.