CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone

Canadian Institute of Mining, Metallurgy and Petroleum
Peter Dunn
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
18
File Size:
476 KB
Publication Date:
May 1, 2011

Abstract

London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices forced closure. Peak production of the prior operations was approximately 2.5 Mt/a in the 1960?s. Following civil war In Sierra Leone, London Mining obtained the mining license in 2006 and commenced activity to redevelop the Marampa mining and processing operations. There are two ore deposits of interest for development as well as a resource comprised of tailings from previous operations. Phase 1 will be the mining of the tailings resource with a 1.8 Mt/a plant producing 66 per cent Fe sinter feed, expandable to 3.6 Mtpa. The first phase is currently under construction with start-up expected in the third quarter of 2011. Phase 2 will include development of the two ore deposits. These deposits are weathered secondary ore and the main primary ore resource. Phase 2 is currently under prefeasibility study and targets a final 16 Mt/a concentrate production in 2016. Outotec partnered with London Mining on testing efforts to develop the magnetic separation flowsheet using SLon VPHGMS machines to process the Marampa material. This paper explains the flowsheet development process for the weathered and primary ores commencing with sample characterization and detailed parametric investigations to evaluate SLon performance. The final flowsheet configuration is explained, including expected circuit recoveries and concentrate quality, clearly demonstrating the performance of the SLon VPHGMS circuit in iron ore tailings treatment applications.
Citation

APA: Peter Dunn  (2011)  CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone

MLA: Peter Dunn CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone. Canadian Institute of Mining, Metallurgy and Petroleum, 2011.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account