Coal - Using Coal Refuse in Building Materials

The American Institute of Mining, Metallurgical, and Petroleum Engineers
J. W. Myers J. J. Pfeiffer A. A. Oming
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
10
File Size:
694 KB
Publication Date:
Jan 1, 1962

Abstract

The method used to process washery refuse for use as a building material aggregate is described. Results of studies made in investigating this process are summarized. The Bureau of Mines, in cooperation with two commercial coal producers, studied the feasibility of using coal washery refuse in manufacturing lightweight aggregate for building materials. Lightweight aggregate is used in making masonry products of lower bulk density than can be produced from conventional aggregate such as sand, gravel, and crushed rock. Among the advantages of lightweight masonry are reduced deadweight loads which reduce materials cost, lower cost of construction labor, and improved thermal and sound insulation. A process for making lightweight concrete aggregate from coal-washery refuse appeared attractive because of the availability of raw material which contained sufficient fuel to carry out the processing. Vast quantities of such refuse have accumulated throughout the coal-producing areas of the U.S. Generally it is stored in unsightly piles, creating a problem of air pollution and using space that could be devoted to other purposes. Conversion of the refuse to lightweight aggregate could remedy these conditions and effectively utilize a material normally considered waste. The first part of the program was conducted in cooperation with the Truax-Traer Coal Co. to determine the feasibility of utilizing refuse from the company's coal preparation plant at Ceredo, W. Va., in manufacturing lightweight aggregate. The aggregate was to be used in making cement blocks comparable to those known in the building trades as cinder blocks. This project was completed in 1954. Based on the results of this work, the cooperator began commercial development and formed the Trulite Corp. for this purpose. A plant capable of handling 120 tpd of refuse was constructed for approximately $120,000. It began operating on June 1, 1955.' In 1959 a similar study was made, under a cooperative agreement with the Carbon Fuel Co. of Charleston, W. Va., to rrscertain the suitability of refuse from its plant for conversion to lightweight aggregate. Under this program various modifications of equipment were made, and the investigation of process variables begun in the previous project was extended. PROCESSING METHOD The formation of lightweight aggregate from coal-washery refuse js governed, in part, by the fusion characteristics of the mineral constituents of the refuse when heated above their softening temperatures. The heat required for this purpose is supplied by the combustihle matter in the refuse. Some of this combustible matter is coal with high ash content, but most of it is carbonaceous shale. Whereas the density of aggregate prepared from clay or shale depends largely on expansion, the density of aggregate made from refuse is reduced by burning out the combustible matter and, to a lesser extent, by expansion of the residue in the fuel bed. A chain-grate stoker with an updraft air system was chosen for the conversion process in preference to a downdraft sintering machine or a rotary kiln. In down-draft sintering, which operates on the overfeed burning principle, the volatile matter from the refuse would distill off without burning, resulting in inefficient combustion and interfering with proper operation of the equipment. The rotary kiln is designed primarily for processing material that lacks, or is low in, combustihle matter with the heat of reaction supplied from external sources. Washery refuse, which is relatively high in carbonaceous material, could burn at the wall of the kiln causing clinker formation with resultant decrease in throughput and increase in production cost. With an up-draft air stream on a chain or traveling-grate stoker, the volatile matter would be carried into the ignition and burning zones where the heat could be utilized more efficiently. The combustion procedure in this type of unit may be considered as consisting of four periods: 1) initial ignition of the top of the bed by furnace radiation, 2) ignition travel through the bed until the whole bed is ignited, 3) burnout of the combustible material with high air rates to fuse and expand the residue, 4) a cooling period. Investigation of the process required a study of the variables that affect both
Citation

APA: J. W. Myers J. J. Pfeiffer A. A. Oming  (1962)  Coal - Using Coal Refuse in Building Materials

MLA: J. W. Myers J. J. Pfeiffer A. A. Oming Coal - Using Coal Refuse in Building Materials. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1962.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account