Collapse and Remining of Tunnel TO8 at THSRC Contract C230

Society for Mining, Metallurgy & Exploration
Gary B. Hemphill William Stewart John Tinkler
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
593 KB
Publication Date:
Jan 1, 2005

Abstract

Of the 345 km long Taiwan High Speed Rail Project, connecting the cities of Taipeiand Kaohsiung, the 23 km alignment on Contract C230 required the construction of5755 m of shallow mined tunnels ranging from 137 m to 1285 m in length. All nine of these tunnels were mined using NATM methodology. On September 6, 2002, a collapse occurred in Tunnel T08 that affected approximately 50 m of tunnel. There was little warning. However, the crew was evacuated approximately 45 minutes prior to failure and thus, no injuries or loss of equipment. This paper will discuss the mining methods, jet grouting ground support, and the instrumentation selected for the rehabilitation and monitoring of the tunnel.
Citation

APA: Gary B. Hemphill William Stewart John Tinkler  (2005)  Collapse and Remining of Tunnel TO8 at THSRC Contract C230

MLA: Gary B. Hemphill William Stewart John Tinkler Collapse and Remining of Tunnel TO8 at THSRC Contract C230. Society for Mining, Metallurgy & Exploration, 2005.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account