Colorado Paper - First Year of Leaching by the New Cornelia Copper Co. (with Discussion)

The American Institute of Mining, Metallurgical, and Petroleum Engineers
H. A. Tobelmann
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
56
File Size:
2513 KB
Publication Date:
Jan 1, 1919

Abstract

age Introduction ............................. 22 Crushing............................... 25 Leaching............................... 28 .Reduction.............................. 47 Electrolytic Deposition..............a.......... 51 Discard for Purification of Electrolyte.................. 60 Recovery of Copper from Discard Solution .............. 62 Resolution of Cement Copper...................... 64 Summary............................... 64 Appendix............................... 66 Discussion............................... 69 Introduction The location, mode of occurrence of ore, and preliminary tests leading to the development of the present leaching process and the building of the present plant on the property of the New Cornelia Copper Co. at Ajo, have been described in previous papers presented to the Institute and in the discussions thereof.l It is sufficient to say that these tests began early in July, 1912, and were continued to the close of January, 1916; that small tests at Douglas were followed by the construction of a 1-ton plant at the mine; and this was followed by the operation of a 40-ton plant for 11 mo. In all about 15,000 T. of ore were treated experiment-
Citation

APA: H. A. Tobelmann  (1919)  Colorado Paper - First Year of Leaching by the New Cornelia Copper Co. (with Discussion)

MLA: H. A. Tobelmann Colorado Paper - First Year of Leaching by the New Cornelia Copper Co. (with Discussion). The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1919.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account