Combined Approach for Surface Mine Short Term Planning Optimization

Society for Mining, Metallurgy & Exploration
Zhang Youdi
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
8
File Size:
314 KB
Publication Date:
Jan 1, 1992

Abstract

A two-step approach has been developed for surface mine short term planning by the authors. The first step is mid term control and planning by the use of Goal Programming. This step gives optimal results for mid term planning (i. e. yearly or quarterly mine plan) as well as a macro control for short term planning (i. e. monthly or weekly plan.) The second step of the approach deals with short term production scheduling by the application of CAD technique and Systems Simulation. An interactive color character graphic design system has been developed with a software package. The menu-driven and module- structured package provides sufficient functions for surface mine short term planning and makes the model very flexible and user-friendly. This model has been applied to a large surface coal mine for short term planning optimization. Satisfactory results have been obtained. It is concluded that for complicated mining conditions this two-step combined approach gives an optimal control of mid term planning, makes the short term planning easier to avoid blindness; it has been proven that the Goal Programming is a powerful tool for solving multi-objective decision-making problems; guided by GP mid term planning, the CAD technique and simulation software package for short term planning are able to be concentrated on their practicality and flexibility.
Citation

APA: Zhang Youdi  (1992)  Combined Approach for Surface Mine Short Term Planning Optimization

MLA: Zhang Youdi Combined Approach for Surface Mine Short Term Planning Optimization. Society for Mining, Metallurgy & Exploration, 1992.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account