Commissioning and Operation of the 800 TPH Heavy Medium Cyclone Plant at Mount Isa Mines Limited

The Australasian Institute of Mining and Metallurgy
Munro PD Pease JD
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
13
File Size:
331 KB
Publication Date:
Jan 1, 1984

Abstract

The heavy medium cyclone plant for the preconcentration of silver-lead-zinc ore prior to grinding and flotation was commissioned in August 1982. This paper details the measures taken to get the plant up to design performance which involved modifications to the medium densifying and slimes clarifying sections. Operating experiences to date are described with emphasis on the low medium consumption recorded and severe wear on process equipment.
Citation

APA: Munro PD Pease JD  (1984)  Commissioning and Operation of the 800 TPH Heavy Medium Cyclone Plant at Mount Isa Mines Limited

MLA: Munro PD Pease JD Commissioning and Operation of the 800 TPH Heavy Medium Cyclone Plant at Mount Isa Mines Limited. The Australasian Institute of Mining and Metallurgy, 1984.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account