Commissioning of the Barrytown Ilmenite Pilot Plant

The Australasian Institute of Mining and Metallurgy
T Wootton
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
4
File Size:
566 KB
Publication Date:
Jan 1, 1990

Abstract

The Barrytown ilmenite pilot plant was commissioned in two stages using Westport Titanium Project heavy mineral concentrate. The wet concentrator was commissioned on the 17 December 1989 and produced magnetic concentrate from this date.   The Drymill was commissioned on the 27 January 1990 and produced product grade ilmenite successfully from the onset.   The commissioning period was exceptionally short by normal standards and few problems were encountered. This paper concludes with general observations of operations of the pilot plant.
Citation

APA: T Wootton  (1990)  Commissioning of the Barrytown Ilmenite Pilot Plant

MLA: T Wootton Commissioning of the Barrytown Ilmenite Pilot Plant. The Australasian Institute of Mining and Metallurgy, 1990.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account