Commissioning the Electrolytic Zinc Plant at Port Pirie

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 11
- File Size:
- 161 KB
- Publication Date:
- Jan 1, 1971
Abstract
Problems encountered in the design, construction, acceptance, commissioning and early operation of the electrolytic zinc plant at Port Pirie are reviewed. Recommendations based on the author's experience are made for proper control of each phase of the development of new plants.
Citation
APA: (1971) Commissioning the Electrolytic Zinc Plant at Port Pirie
MLA: Commissioning the Electrolytic Zinc Plant at Port Pirie. The Australasian Institute of Mining and Metallurgy, 1971.