Computer Optimization Of Service Hoisting Plants

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 413 KB
- Publication Date:
- Jan 1, 1992
Abstract
The service hoisting plant in the mining transportation is an installation serving for the vertical transport of material and persons. An adequate mathematical model is presented for simple evaluation of the project parameters where different plant designs and the ways of transport are take into consideration. The technical and economical optimization procedure is added to the basic mathematical model of the project. This approach enables on one hand the optimization of the reconstruction of the multi-purpose hoisting plants in order to suppress possible bottle necks, while on the other hand it enables the determination of such values of the parameters of the choice and of the operation that the sum of total expenses per a transport unit' becomes the lowest. The optimization procedure is designed in such a way that all numerical data of the optimum hoisting plant are printed out together with the graphical representation of dependencies of the fundamental parameters in broader optimization region.
Citation
APA:
(1992) Computer Optimization Of Service Hoisting PlantsMLA: Computer Optimization Of Service Hoisting Plants. Society for Mining, Metallurgy & Exploration, 1992.