Concept and Operation of the New Conventional Cell House of Asturiana de Zinc at San Juan de Nieva, Spain
    
    - Organization:
 - The Australasian Institute of Mining and Metallurgy
 - Pages:
 - 6
 - File Size:
 - 621 KB
 - Publication Date:
 - Jan 1, 1993
 
Abstract
In May 1991, AZSA commissioned a new conventional Cell House. This  paper focuses on the major improvements introduced in the design and  the construction of the equipment, machinery and control. An effective control system together with good reporting and routine  operation has resulted in quality control of the Cell House at the highest  possible level. Consequently the monthly current efficiency consistently  averages above 93 per cent with a total energy usage of 3000 AC kWh/t  of cathode zinc. The new concept for the year 2000 and beyond is introduced.
Citation
APA: (1993) Concept and Operation of the New Conventional Cell House of Asturiana de Zinc at San Juan de Nieva, Spain
MLA: Concept and Operation of the New Conventional Cell House of Asturiana de Zinc at San Juan de Nieva, Spain. The Australasian Institute of Mining and Metallurgy, 1993.