Construction and Utilisation of the Olympic Dam Service Decline

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
674 KB
Publication Date:
Jan 1, 1988

Abstract

The mining production rate of two million tonnes per annum at Olympic Dam required greater servicing capacity than was available with the existing Whenan Shaft. To increase servicing capability a Service Decline was constructed from June 1986 to June 1987 extending 2000 m from the surface and linking up with inclining development from the existing Whenan Shaft workings. The decline was used for access of all men and materials during the construction phase of the ore handling system. During production, most mine servicing will be via the decline with hoisting of rock through Whenan Shaft.
Citation

APA:  (1988)  Construction and Utilisation of the Olympic Dam Service Decline

MLA: Construction and Utilisation of the Olympic Dam Service Decline. The Australasian Institute of Mining and Metallurgy, 1988.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account