Construction and Utilisation of the Olympic Dam Service Decline
    
    - Organization:
 - The Australasian Institute of Mining and Metallurgy
 - Pages:
 - 6
 - File Size:
 - 674 KB
 - Publication Date:
 - Jan 1, 1988
 
Abstract
The mining production rate of two  million tonnes per annum at Olympic Dam  required greater servicing capacity than was  available with the existing Whenan Shaft. To increase servicing capability a  Service Decline was constructed from  June 1986 to June 1987 extending 2000 m from  the surface and linking up with inclining  development from the existing Whenan Shaft  workings. The decline was used for access of all  men and materials during the construction  phase of the ore handling system. During  production, most mine servicing will be via  the decline with hoisting of rock through  Whenan Shaft.