Construction Management of Hydrogeological Aspects of Melbourne City Link Project

The Australasian Institute of Mining and Metallurgy
I A. Lamb
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
11
File Size:
874 KB
Publication Date:
Jan 1, 1999

Abstract

The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two tunnels are located essentially under the Kings Domain, the Yarra River and, in the case of the longer Burnley Tunnel, under the inner suburb of Richmond. The Burnley Tunnel is 3.5 km long and reaches a depth of 65 m at the central Swan Street Shaft, the invert being at RL -60 m. The Domain Tunnel is 1.6 km long, with the invert reaching RL -20. The tunnels were driven, for the most part, in the siltstone and sandstone of the Silurian Age Melbourne Formation. Construction aspects of the driven tunnels as related to the engineering geology have been described by Hutchison et al (1998). The Silurian bedrock is a fractured rock aquifer that is connected to overlying alluvial aquifers. Excavation of the tunnels allowed temporary groundwater inflows which substantially de-pressurised portions of the various aquifers. This de-pressurisation provided the potential to accelerate on-going secondary consolidation rates of the Holocene Aged Coode Island Silt (CIS) and the older Quaternary Fishermens Bend Silt (FBS) deposits, in areas where these materials directly overly the aquifers. As a large portion of the urban area of South Melbourne and the old river course of the Yarra River contain extensive CIS deposits, and were within the drawdown influence of the tunnels, the management of the hydrogeological regime was very important. The permanent design of the tunnels comprised drained and undrained sections (a partially tanked design) which, along with some permanent recharge, provide long-term protection against the possibility of accelerated settlement rates. During construction TOJV implemented a comprehensive groundwater management plan to deal with issues related to the temporary drawdown of the aquifers and the temporary acceleration of settlement. This paper describes the hydrogeological regime, the effects of the tunnelling, the monitoring programs, the extensive temporary recharge system, and the consultation program that TOJV utilised to manage the hydrogeological issues.
Citation

APA: I A. Lamb  (1999)  Construction Management of Hydrogeological Aspects of Melbourne City Link Project

MLA: I A. Lamb Construction Management of Hydrogeological Aspects of Melbourne City Link Project. The Australasian Institute of Mining and Metallurgy, 1999.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account