Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri Lanka

Society for Mining, Metallurgy & Exploration
Ataollah Rahbar Jamal Rostami
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
1633 KB
Publication Date:
Jan 1, 2016

Abstract

"Uma Oya Multipurpose Development Project is under construction in Sri Lanka. This project involves 2 Rolled Concrete Core (RCC) Dams connected through a tunnel currently under construction by Drill and Blast method. The water is transferred from first diversion dam to the 2nd regulatory dam and from which, it will be transferred through a 14 km headrace tunnel to the top of a 650 m deep drop shaft that feeds the high pressure water to an underground powerhouse and turbine chamber for generation of 120 MW of electricity. The Headrace and Tailrace tunnels are being excavated by two 4.4 m diameter double shield TBMs. The headrace tunnel has already passed 5km milestone and is mined in hard rock, while the tailrace tunnel has been completed in rather weak and fractured ground. This paper will review the history of the project along with the geology of the site. The operation of TBM in headrace tunnel will be discussed in more detail, focusing on the challenges of excavating through very strong and abrasive quartzite and gneiss on this site, as well as reaches of tunnel in high inflow of water reaching 400 L/Sec. INTRODUCTION This paper aims to introduce the Uma Oya Multipurpose Development Project (UOMDP) as a hydro mechanical project in Sri Lanka, targeted generating hydro-electric power, transferring water for irrigation purposes and controlling seasonal devastating flood. This project lies in the south-eastern part of the central highland region of Sri Lanka (Figure 1). The main part of the project is located in the south-western part of the Badulla district in the province of Uva. The south-eastern end of the project site is in the central west of the Moneragala district (province of Uva). Bandarawela is the largest urban setting within the project area, located halfway between the upstream and the downstream ends of the planned hydropower plant and combination of dams, tunnels, and downstream facilities. The Multi-Purpose Project Of Uma Oya is planned to convey water from Uma Oya to Kirindi Oya Basin for hydroelectric energy generation includes Puhulpola RCC Dam on the Uma Oya river, Dyraaba RCC Dam on the Mahatotilla Oya river, a conveyance tunnel from Uma Oya to Mahatotilla Oya (L=3750m), a long feeder tunnel from Mahatotilla Oya to Kirindi Oya. The feeder (power) tunnel Lot consists of a headrace tunnel (L=15554m), the surge shaft (L=200m) and tank on the upstream of the vertical shaft, a vertical shaft with steel lining (L=650m), an underground powerhouse and a tailrace tunnel (L=3650m)."
Citation

APA: Ataollah Rahbar Jamal Rostami  (2016)  Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri Lanka

MLA: Ataollah Rahbar Jamal Rostami Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri Lanka. Society for Mining, Metallurgy & Exploration, 2016.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account