Construction of the East-West Cross Drift Tunnel at the Yucca Mountain Site

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 23
- File Size:
- 3777 KB
- Publication Date:
- Jan 1, 1999
Abstract
Following the completion of the 7,600 m primary access tunnel by Kiewit/Parsons Brinckerhoff (K/PB) in April 1997, an exploratory East-West Cross Drift Tunnel was constructed at the Yucca Mountain Project over the proposed future repository block for high level nuclear wastes. The 2,681 m (8,796 LF) East-West Cross Drift Tunnel was excavated through volcanic tuffs having zones of incompetent rock using a re-built Robbins 5.000 m (16’-5”) hardrock TBM with a special arrangement of supporting equipment. Details of the unusual site and contract conditions will be discussed as well as with the unique tunnel equipment specified by the Owner. This portion of the Yucca Mountain project required eight months to complete.
Citation
APA:
(1999) Construction of the East-West Cross Drift Tunnel at the Yucca Mountain SiteMLA: Construction of the East-West Cross Drift Tunnel at the Yucca Mountain Site. Society for Mining, Metallurgy & Exploration, 1999.