Construction of the East-West Cross Drift Tunnel at the Yucca Mountain Site

Society for Mining, Metallurgy & Exploration
Brian Fulcher John Eastlund J. B. Copeland
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
23
File Size:
3777 KB
Publication Date:
Jan 1, 1999

Abstract

Following the completion of the 7,600 m primary access tunnel by Kiewit/Parsons Brinckerhoff (K/PB) in April 1997, an exploratory East-West Cross Drift Tunnel was constructed at the Yucca Mountain Project over the proposed future repository block for high level nuclear wastes. The 2,681 m (8,796 LF) East-West Cross Drift Tunnel was excavated through volcanic tuffs having zones of incompetent rock using a re-built Robbins 5.000 m (16’-5”) hardrock TBM with a special arrangement of supporting equipment. Details of the unusual site and contract conditions will be discussed as well as with the unique tunnel equipment specified by the Owner. This portion of the Yucca Mountain project required eight months to complete.
Citation

APA: Brian Fulcher John Eastlund J. B. Copeland  (1999)  Construction of the East-West Cross Drift Tunnel at the Yucca Mountain Site

MLA: Brian Fulcher John Eastlund J. B. Copeland Construction of the East-West Cross Drift Tunnel at the Yucca Mountain Site. Society for Mining, Metallurgy & Exploration, 1999.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account