Construction of the Wolf Creek Upper Narrows Tunnel Waterproof Membrane—A Comparison of Tunnel Projects Utilizing the Application of Spray-on Waterproof Membrane

Society for Mining, Metallurgy & Exploration
A. J. Blair L. L. Lacerda
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
14
File Size:
1043 KB
Publication Date:
Jan 1, 2005

Abstract

The Wolf Creek Upper Narrows Tunnel (Upper Narrows Tunnel) is one of the first major highway tunnel in the United States implementing the use of spray-on membrane for purposes of constructing a double-shell drainage solution between an initial shotcrete lining and a final cast-in-place concrete lining (Figure 1). In the case of the Upper Narrows Tunnel the primary membrane is constructed with a spray-on product manufactured by Degussa, namely Masterseal® 340 FA (MS 340) that has been utilized previously in other tunnel projects. Shotcrete-like in application, but differing in physical properties, MS 340 is now outdated, and is succeeded by Masterseal® 345 (MS 345), a nearly identical product, with improvements in material properties. Tunnel project histories utilizing either MS 340 or MS 345 are discussed and summarized with regard to the respective motives for prompting spray-on membrane selection and the realized benefits resulting from spray-on membrane construction. With an emphasis on the Upper Narrows Tunnel, project summaries discuss details of the aspects of design for spray-on membrane construction methodology as opposed to conventional sheet membrane construction methodologies. It is anticipated that experience gained during the construction of the Upper Narrows Tunnel with respect to other tunnel projects that have utilized spray-on membrane will be of use for future tunnels employing spray-on membrane in drainage solutions.
Citation

APA: A. J. Blair L. L. Lacerda  (2005)  Construction of the Wolf Creek Upper Narrows Tunnel Waterproof Membrane—A Comparison of Tunnel Projects Utilizing the Application of Spray-on Waterproof Membrane

MLA: A. J. Blair L. L. Lacerda Construction of the Wolf Creek Upper Narrows Tunnel Waterproof Membrane—A Comparison of Tunnel Projects Utilizing the Application of Spray-on Waterproof Membrane. Society for Mining, Metallurgy & Exploration, 2005.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account