Content and Structure of a Plant Grinding Performance Management/Improvement System

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 7
- File Size:
- 804 KB
- Publication Date:
- Jan 1, 2015
Abstract
The Functional Performance Equation for ball milling circuits provides plant staff with a new means to improve circuit performance. However, successful execution of a plant processing performance improvement project, with verifiable improvements, requires a significant number of accompanying steps beyond using this equation. In order to identify and articulate all these steps, a study was undertaken with the metallurgical staff from two milling operations and process application specialists from a grinding media manufacturing company. “Task analysis” of improving plant grinding performance was carried out. This analysis identified the required steps, and ultimately yielded a “Plant Grinding Circuit Processing Performance Management/ Improvement System.
Citation
APA:
(2015) Content and Structure of a Plant Grinding Performance Management/Improvement SystemMLA: Content and Structure of a Plant Grinding Performance Management/Improvement System. Canadian Institute of Mining, Metallurgy and Petroleum, 2015.