Continuous Reactor Altonorte Smelter

Canadian Institute of Mining, Metallurgy and Petroleum
R. ZapataN.
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
13
File Size:
770 KB
Publication Date:
Jan 1, 2007

Abstract

"In the following report, Altonorte Smelter owned by Xstrata will explain its experience with its denominated furnace called ""Continuous Altonorte Reactor"" since started up in March 2002. The Reactor is the main and only smelting furnace since the operation of Reverb Furnace was stopped (15 days after the start up of the Reactor) and it can be operate with dry concentrate for injection by tuyere and wet concentrated via Garr Gun when the injection system fails. From the started up of the Reactor, three operational campaigns have been carried out where in each one they have been increased their smelting throughput and availability. The flexibility reached by the technology bath smelting has allowed a high level of smelting of concentrate and revert materials. The high availability of the Reactor and overcoming problems that were considered of high complexity like the extraction of white metal and slag, refractory campaign, etc. has allowed the Altonorte smelter to project to smelting 1,200,000 tonnes per year with its only Reactor in next year."
Citation

APA: R. ZapataN.  (2007)  Continuous Reactor Altonorte Smelter

MLA: R. ZapataN. Continuous Reactor Altonorte Smelter. Canadian Institute of Mining, Metallurgy and Petroleum, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account